First Energy Substation Projects

The Hillis Group successfully completed multiple projects for First Energy, delivering exceptional results through precise execution and attention to detail. Each project encompassed critical elements such as grading, excavation, conduit installation, and concrete work, ensuring optimal functionality and long-term durability. The scope of work involved expertly excavating trenches to accommodate…

Continue Reading

Louise Moore Park

The Hillis Group successfully completed a multifaceted site preparation and construction project, delivering high-quality results. The work included installing a 12″ compost filter sock, rock construction entrance, inlet protection, erosion control matting, temporary fencing, and stabilizing stockpiles. Survey layout utilized the Trimble system, with CAD files provided by others. Earthwork…

Continue Reading

Warriner Pond Substation

The Hillis Group was contracted to compete the civil scope of work associated with a new substation including the following:  Clearing, site/final grading, drainage for the new substation, installation of all temporary access roads and removal (stone and matted), temporary and permanent environmental measures (silt fence, stabilized construction entrances, basins,…

Continue Reading

Station 610 Solar Field

The Hillis Group provided expert civil site work for the installation of a solar panel far.  Our scope of work included site preparation, grading, and excavation to create a stable foundation for solar panel arrays. We installed trenches to support electrical infrastructure, ensuring seamless integration with the solar system’s design.…

Continue Reading

Popeye’s & Arby’s

The project involved comprehensive site preparation, including erosion control measures like installing silt fences, protecting inlets, and stabilizing stockpiles. Demolition work included removing concrete, asphalt, and existing structures. Earthwork tasks covered site grading, importing fill material for building pads and parking areas, and topsoil spreading for landscaping. A modular retaining…

Continue Reading

Leader of the Pack

The Hillis Group started this project by placing erosion controls, including the installation of compost filter socks, inlet protection using concrete blocks, fabric, and stone, erosion control blankets, and the temporary stabilization of topsoil piles with seed and mulch. Demolition activities of the old asphalt and concrete were then carried…

Continue Reading

Oyster Creek

The project for JW Didado included providing Ground Penetrating Radar location services prior to excavation. The team demolished one circuit breaker foundation entirely and partially removed four bus support foundations to 6 inches below the finished grade. Mechanical excavation and backfill were performed for concrete foundations, which were then formed…

Continue Reading

Glenview Dairy Project

In early 2024, The Hillis Group undertook a project in upstate New York for the client to capture methane gas from a manure pond and connect it to a compressor station. The Hillis Group performed the groundwork necessary for the construction of the compressor station. Installation of a 20′ wide…

Continue Reading

Adelphia Gateway – Quakertown

Existing site conditions would not allow a typical drainage basin to manage the storm water runoff created from a new natural gas compressor station.  Engineers designed an underground filtration and storage system to handle the storm water runoff.  Our crew excavated and installed the underground storm water management tank system…

Continue Reading

Dirt Works – Fellowship Road Sink Hole Remediation

The Hillis Group was contracted to mitigate an area of existing pipeline right of way that has been plagued with ditch line subsidence.  This project consisted of removing asphalt driveways and pedestrian walk paths to excavate compromised soils around and under the existing pressurized natural gas pipeline.  Sloping and trench…

Continue Reading