Popeye’s & Arby’s

The project involved comprehensive site preparation, including erosion control measures like installing silt fences, protecting inlets, and stabilizing stockpiles. Demolition work included removing concrete, asphalt, and existing structures. Earthwork tasks covered site grading, importing fill material for building pads and parking areas, and topsoil spreading for landscaping. A modular retaining…

Continue Reading

Leader of the Pack

The Hillis Group started this project by placing erosion controls, including the installation of compost filter socks, inlet protection using concrete blocks, fabric, and stone, erosion control blankets, and the temporary stabilization of topsoil piles with seed and mulch. Demolition activities of the old asphalt and concrete were then carried…

Continue Reading

Glenview Dairy Project

In early 2024, The Hillis Group undertook a project in upstate New York for the client to capture methane gas from a manure pond and connect it to a compressor station. The Hillis Group performed the groundwork necessary for the construction of the compressor station. Installation of a 20′ wide…

Continue Reading

Station 327

The Hillis Group was contracted by Longtime client Michels Pipeline to install all of the environmental controls on a new compressor station.  Our work included a total of 4,552 LF of super silt fence, 706 LF of straw bale barrier , 180 LF of stone barrier, one rock construction entrance…

Continue Reading

Springville Meter Station Atlantic Sunrise

The Hillis Group performed the civil site work for the Springville Meter Station. Our work included the site clearing, stripping and stockpile of topsoil, temporary gravel surface for laydown yard, erosion control devices, cuts and fills necessary to bring the site to grade, stormwater retention basins, stormwater piping and outflow…

Continue Reading