We put ourselves on the line.

Louise Moore Park

The Hillis Group successfully completed a multifaceted site preparation and construction project, delivering high-quality results. The work included installing a 12″ compost filter sock, rock construction entrance, inlet protection, erosion control matting, temporary fencing, and stabilizing stockpiles. Survey layout utilized the Trimble system, with CAD files provided by others. Earthwork…

Continue Reading

Station 610 Solar Field

The Hillis Group provided expert civil site work for the installation of a solar panel far.  Our scope of work included site preparation, grading, and excavation to create a stable foundation for solar panel arrays. We installed trenches to support electrical infrastructure, ensuring seamless integration with the solar system’s design.…

Continue Reading

Popeye’s & Arby’s

The project involved comprehensive site preparation, including erosion control measures like installing silt fences, protecting inlets, and stabilizing stockpiles. Demolition work included removing concrete, asphalt, and existing structures. Earthwork tasks covered site grading, importing fill material for building pads and parking areas, and topsoil spreading for landscaping. A modular retaining…

Continue Reading

Leader of the Pack

The Hillis Group started this project by placing erosion controls, including the installation of compost filter socks, inlet protection using concrete blocks, fabric, and stone, erosion control blankets, and the temporary stabilization of topsoil piles with seed and mulch. Demolition activities of the old asphalt and concrete were then carried…

Continue Reading

Glenview Dairy Project

In early 2024, The Hillis Group undertook a project in upstate New York for the client to capture methane gas from a manure pond and connect it to a compressor station. The Hillis Group performed the groundwork necessary for the construction of the compressor station. Installation of a 20′ wide…

Continue Reading

Station 327

The Hillis Group was contracted by Longtime client Michels Pipeline to install all of the environmental controls on a new compressor station.  Our work included a total of 4,552 LF of super silt fence, 706 LF of straw bale barrier , 180 LF of stone barrier, one rock construction entrance…

Continue Reading

Springville Meter Station Atlantic Sunrise

The Hillis Group performed the civil site work for the Springville Meter Station. Our work included the site clearing, stripping and stockpile of topsoil, temporary gravel surface for laydown yard, erosion control devices, cuts and fills necessary to bring the site to grade, stormwater retention basins, stormwater piping and outflow…