Springville Meter Station Atlantic Sunrise
The Hillis Group performed the civil site work for the Springville Meter Station. Our work included the site clearing, stripping and stockpile of topsoil, temporary gravel surface for laydown yard, erosion control devices, cuts and fills necessary to bring the site to grade, stormwater retention basins, stormwater piping and outflow control structures, amended soils, chain link fencing, site restoration and permanent access roads.