Station 327
The Hillis Group was contracted by Longtime client Michels Pipeline to install all of the environmental controls on a new compressor station. Our work included a total of 4,552 LF of super silt fence, 706 LF of straw bale barrier , 180 LF of stone barrier, one rock construction entrance and onsite hauling services. Crews also assisted Michels with hand excavation over existing active natural gas line to verify location.