Sub Station Flood Walls
In the aftermath of hurricane Sandy our client realized the need to protect their critical substations from future flooding. The Hillis Group was selected to complete a multifaceted civil site project that required working around above and below grade energized electrical equipment. The work scope included excavation, forming and pouring…