Ingalls 710 Pipeline Installation
This project consisted of the installation of 2.12 miles of 8” natural gas pipeline in the subzero degrees of winter. The Hillis Group tied a new gas well into an existing 12” transmission line. The scope of work also included clearing the right of way, fabrication and installation of a new launcher and receiver (including concrete foundations), (3) conventional road bores totaling 246LF and 1,565 LF of horizontal direction drill.