Warriner Pond Substation
The Hillis Group was contracted to compete the civil scope of work associated with a new substation including the following: Clearing, site/final grading, drainage for the new substation, installation of all temporary access roads and removal (stone and matted), temporary and permanent environmental measures (silt fence, stabilized construction entrances, basins, etc) Rock excavation and site prep including cut/fill of 40,000CY, supply/install precast drainage inlets, manholes, HDPE storm piping, final restoration/seeding and gravel surfacing. Scope includes cast in place concrete foundations for new equipment.