Skip To Content
We put ourselves on the line.

Hudson River Valve

  • Civil Project
  • Pipeline Project
  • Buchanan, New York
  • May - June 2022

Hudson River Crossing

The Hudson River Crossing project took place along the banks of the Hudson River on both the Pennsylvania and New York sides.  Our work included the safe removal of multiple trees around active energized natural gas equipment, installation of a 12’ high Redi Rock retaining wall, new permanent site security chain link fencing and the new grounding system for the fence.

Valve Site 14A:  396 LF of 7’ high +1’ barb wire fence with (3) 16’ wide double drive access gates with new grounding

Valve Site 14B:  12’ high x 78’ long Redi Rock retaining wall, 200 LF of 7’ high +1’ barb wire chain link fence with (1) 16’ wide double drive access gate and (1) 12’ wide double rive access gate and new grounding.

Let’s discuss your project needs. Contact us today!