Anomaly Dig M26

This project consisted of the replacement of an 80’ section of 24” transmission gas pipeline located on the side of a hill with 45-degree slopes.  The Hillis Group was required to winch all equipment and material down the hillside.  Project consisted of building and removing temporary access road, removal of…